LOT 1A
BP01-A
BP01-B
BP01-C
BP02-A
BP02-B
1/2 PLATE - 3/4 AB - 3" REQD. PROJECTION
1/2 PLATE - 3/4 AB - 3" REQD. PROJECTION
1/2 PLATE - 3/4 AB - 3" REQD. PROJECTION
1/2 PLATE - 3/4 AB - 3" REQD. PROJECTION
1/2 PLATE - 3/4 AB - 3" REQD. PROJECTION
8"
8"
8"
8 1/8"
1 1/2"
1 1/2"
8 1/8"
1 1/2"
1 1/2"
STEEL LINE
B
5 3/8" 3" 3 1/2"
01/10/2022 06:39:11am
1 1/2" 1 1/2"
8" 3 1/2" 3" 5 3/8"
8"
1 1/2" 1 1/2"
3 1/2" 3" 5 3/8"
11 7/8"
11 7/8"
8"
2" 3"
3 1/8"
11 7/8"
STEEL LINE
STEEL LINE
(972) 524-5407
(972) 524-5417 FAX:
1 1/2"
1 1/2"
1'-4"
11 1/2"
PHONE:
2"
3"
3 1/8"
1'-4"
STEEL LINE
7
M
M
STEEL LINE
STEEL LINE
7
STEEL LINE
BP02-C
BP02-D
BP02-E
BP02-F
BP02-G
1/2 PLATE - 3/4 AB - 3" REQD. PROJECTION
1/2 PLATE - 3/4 AB - 3" REQD. PROJECTION
1/2 PLATE - 3/4 AB - 3" REQD. PROJECTION
1/2 PLATE - 3/4 AB - 3" REQD. PROJECTION
1/2 PLATE - 3/4 AB - 3" REQD. PROJECTION
STEEL LINE
STEEL LINE
3 1/8"
3" 2"
8 1/8"
3 1/8"
3"
2"
1 1/2" 1 1/2"
1 1/2" 1 1/2"
8"
STEEL LINE
8"
1 1/2" 1 1/2"
3 1/8"
3" 2"
2" 3" STEEL LINE
3 1/8"
1'-4"
1'-4"
BASE PLATE DETAILS DRAWING TITLE
8" STEEL LINE
8 1/8"
2" 3"
3 1/8"
PROJECT NAME EMS - Phase II
1 1/2" 1 1/2"
1 1/2" 1 1/2"
1'-4"
1'-4"
8"
8"
8 1/8"
8 1/8"
4060 T.B. Herndon Avenue COLUMN BASE PLATES, EXCEPT 1/2 INCH DIAMETER ANCHOR RODS LOCATED AT DOORS WHICH SHALL ALL ANCHOR RODS SHALL HAVE A 3 INCH PROJECTION (UNLESS NOTED) ABOVE THE BOTTOM OF THE ERECTION NOTE!!! 2. BOTTOM OF BASE PLATE (B.O.B.P.) = 100'-0" EXCEPT AS NOTED. 1. FINISHED FLOOR ELEVATION = 100'-0" ERECTION NOTE!!!
STEEL LINE
STEEL LINE
8 1/8"
STEEL LINE
STEEL LINE
CUSTOMER NAME SIENNA CONSTRUCTION Baton Rouge, LA 70807 PROJECTING THREADS SHOULD BE GREASED OR OTHERWISE PROTECTED FROM CORROSION. DOUBLE NUTS, PLATE WASHERS, LEVELING PLATES, ETC., THAT MAY BE SPECIFIED BY OTHERS. ADDITIONAL PROJECTION LENGTH MUST BE CONSIDERED AND PROVIDED FOR ITEMS SUCH AS GROUT, ANCHOR BOLT MUST BE FLUSH WITH OR ABOVE THE TOP OF THE NUT. ONE 3/16 INCH WASHER, AND ONE HEAVY HEX NUT. IN THE INSTALLED POSITION, THE TOP OF THE THE PROJECTIONS SPECIFIED PROVIDE FOR A SINGLE BASE PLATE THICKNESS, AND APPLICATION OF ALL ANCHOR RODS SHALL HAVE A MINIMUM THREAD LENGTH OF 1/4 INCH LESS THAN THE PROJECTION. HAVE PROJECTION OF 1 INCH. JOB NUMBER T21V0558A ADDRESS
# RELEASE / REVISION DWN / CHK ENG DATE 0 ANCHOR RODS CM / ATS BMO 09/27/2021 1 PERMITS CM / ATS BMO 10/05/2021 2 REV. ANCHOR BOLTS BTW / JMW 11/29/2021 3 Finals BTW / TJF 01/06/2022 AB2 SHEET DRAWING STATUS FOR CONSTRUCTION HAE
BP03-A
BP03-B
BP03-C
BP05-A
BP04-A
1/2 PLATE - 3/4 AB - 3" REQD. PROJECTION
1/2 PLATE - 3/4 AB - 3" REQD. PROJECTION
1/2 PLATE - 3/4 AB - 3" REQD. PROJECTION
3/4 PLATE - 3/4 AB - 3" REQD. PROJECTION
1/2 PLATE - 3/4 AB - 3" REQD. PROJECTION
8"
STEEL LINE
2 7/8"
3"
2"
8"
8"
2"
3"
3 1/2"
STEEL LINE
STEEL LINE
5 3/8" 3" 3 1/2"
1 1/2" 1 1/2"
1 1/2" 1 1/2"
5 3/8" 3" 3 1/2"
STEEL LINE
11 7/8"
8"
5 3/8" 3" 3 1/2"
11 7/8"
8"
11 7/8"
1 1/2"
1 1/2"
STEEL LINE
7 7/8"
2'-8"
1 1/2"
1 1/2"
STEEL LINE
8 1/2"
1 1/2"
1 1/2"
5
11 1/2"
STEEL LINE
BP06-A
BP06-B
BP06-C
BP06-D
3/4 PLATE - 3/4 AB - 3" REQD. PROJECTION
3/4 PLATE - 3/4 AB - 3" REQD. PROJECTION
3/4 PLATE - 3/4 AB - 3" REQD. PROJECTION
3/4 PLATE - 3/4 AB - 3" REQD. PROJECTION
STEEL LINE
8"
8"
6
STEEL LINE
1'-4"
5 1/2" 3" 3 1/2"
1 1/2"
1 1/2"
1 1/2"
1 1/2"
5 1/2" 3" 3 1/2"
1'-0"
1'-0"
01/ 18/ 202 2
3 1/2" 3" 5 1/2"
STEEL LINE
3 1/2" 3" 5 1/2"
1'-0"
STEEL LINE
1 1/2"
1 1/2"
1'-0"
1 1/2"
1 1/2"
1'-4"
STEEL LINE
8"
K
K
8"
STEEL LINE
Made with FlippingBook - Share PDF online