LOT 1A

01/05/2022 02:43:48pm # RELEASE / REVISION DWN / CHK ENG DATE 0 FINALS DBO / RR 01/18/2022 STO

MAXIMUM SPACING GRID LINE DOWNSPOUT SCHEDULE

BUILDING ID LOADING DOCK

2 LOCATIONS

A

45'-0"

DOWNSPOUT STRAP BRACKET (DBA01) REQUIRED AT COLUMN FLANGES. INDICATES 4" x 5" x 10'-0" CORRUGATED DOWNSPOUT (MK. H2305) REFER TO DETAIL GA0130 FOR INFORMATION.

SIDEWALL SHEETING ELEVATION AT LINE A LOADING DOCK BLDG. DRAWING TITLE

PROJECT NAME EMS - Phase II

PERM OPEN

14'-10"

T21V0558A ADDRESS

S14 SHEET CUSTOMER NAME SIENNA CONSTRUCTION Baton Rouge, LA 70807 DRAWING STATUS FOR CONSTRUCTION 4060 T.B. Herndon Avenue

JOB NUMBER

40'-5"

7

4

SIDEWALL SHEETING ELEVATION AT LINE LOADING DOCK BLDG.

01/18/2022

Made with FlippingBook - Share PDF online