LOT 1A

ACTUAL SHOWN SHORTENED MARKS

D1

(2)PB854

BB0050

BB0050

BB0055

S1

PBX-201

S2

PBX-202

40'-5"

01/10/2022 06:41:18am

4

5

7

15'-1 1/2"

25'-3 1/2"

(5) REQUIRED 80Z-200 (U.N.O.)

LAP TYP. U.N.O. 3'-0" - 3'-0"

(5) REQUIRED 80Z-201 (U.N.O.)

LOW EAVE

BA0040

(972) 524-5407

(972) 524-5417 FAX:

A

A

80E1-200

80E1-201

PHONE:

BA0040

BA0010

S1

S2

S1

S1

S1

S1

S1

S2

D1

D1

D1

D1

ROOF FRAMING PLAN (LOADING DOCK) DRAWING TITLE

PROJECT NAME EMS - Phase II

T21V0558A ADDRESS

CUSTOMER NAME SIENNA CONSTRUCTION DRAWING STATUS FOR CONSTRUCTION Baton Rouge, LA 70807 4060 T.B. Herndon Avenue

# RELEASE / REVISION DWN / CHK ENG DATE 0 PERMITS CM / ATS BMO 10/05/2021 1 Finals BTW / TJF 01/06/2022 E19 SHEET HAE

JOB NUMBER

22'-4 1/2"

22'-4 1/2"

D1

D1

D1

D1

D1

D1

D1

D1

BC0051

BC0051

80C-13

BC0051

80C-24

B

B

WAREHOUSE

15'-1 1/2"

25'-3 1/2"

Notes:

4

5

7

SPECIFIC REQUIREMENTS AND A325 BOLTS ARE BOTH USED. REFER TO THE DETAILS FOR PURLIN AND EAVE STRUT CONNECTION BOLT REQUIREMENTS: A307

PLANE NAME: M04, M03, A08, R04

01/ 18/ 202 2

SEE CROSS SECTION DRAWINGS FOR MAIN FRAME FLANGE BRACING.

ROOF FRAMING PLAN (LOADING DOCK)

AT THAT FRAME LINE U.N.O. DETAIL NUMBERS LISTED ABOVE EACH LINE ARE TYP

REFER TO B00010 FOR PURLIN SUPPORT METHODS DETAIL.

INSULATION MUST BE INSTALLED AROUND PURLIN BRACING SYSTEM.

Made with FlippingBook - Share PDF online